PROPELTECH · Dependable ropes for life on the water
All boating guides

How Many Dock Lines Do I Need? What Each Line Is For

A motorboat and a sailboat beside a small timber dock on a calm lake. AI-created marina illustration.

Four working lines are a common starting arrangement alongside a dock: a bow line, a stern line and two springs. A slip with pilings on both sides may use six working lines: two bow, two stern and two springs. Examples are provided in the Pursuit S288 owner's manual. Spare lines would be added separately.

However, it can be difficult to know what "I carry six" means: does it mean there are two extra lines stowed in the locker, are they all used, or do they belong to the permanent set at the home dock?

This is what I would clarify before purchasing two more ropes.

First of all, figure out what roles four ropes play

In the described four-line side-tie, the bow and stern lines keep the bow and stern of the boat relative to the dock, and the springs limit movement along the dock.

Top-down diagram of a boat tied alongside a dock with one bow line, one stern line and two opposing spring leads; the bow faces right.
A common four-line alongside example. The two spring leads limit movement along the dock; spares are counted separately.

Let's suppose that the boat starts moving forward. A spring line led aft from a suitable forward attachment on the boat checks this movement. Reversing the lead direction, from an aft attachment on the boat forward along the dock, checks movement astern. Depending on the cleat location at the center of the boat, the route can be shorter; the spring line does not have to cover the whole length of the boat.

So when selecting four ropes, consider the routes they are supposed to follow. Two ropes at the bow and two at the stern may seem sufficient, but this number won't provide you with enough information about which rope prevents movement forward and backward.

After finding out where the rope goes, establish the length necessary to reach and secure it. This is when the purchased set can prove inadequate: four ropes in the package, but one cannot reach the required cleat.

Every neighbor's boat can have different cleats to work with

The owner of Hunter 33 raised a typical question in the Sailboat Owners forum: he has lines at all four corners and a spring, while other boats around him seem to manage without springs. What is the reason for this?

One reply explained the effect of the positions of cleats at the dock. Turning the boat from bow-in to stern-in position, you get quite different rope leads. Corner lines can help check fore-and-aft movement in one configuration but lead almost straight across to the dock in another.

It means that blindly copying the neighbor's rope count can lead you to confusion. Instead, follow the ropes and figure out what rope would take the load in case the boat moves forward and what would prevent this movement backward.

A floating dock can rise and fall with the boat while still allowing movement along the dock. Take into consideration the expected tides, wakes, winds, and currents when analyzing the layout of the ropes. The layouts described here are not storm plans.

Six ropes may sound generous until all six are used

Here is a sample inventory of the lines, assuming each rope is serviceable and suitable for its assigned job:

Lines carried Lines in use at this stop Lines still available
6 4 2
6 6 0

In the second row, you have six dock lines but no spare. Nothing has been lost. All of them are used.

In the first row, you should figure out what the two unused lines can substitute. Can one of them reach the attachment for the spring-line? Can the other line fit the hardware where it might be needed? An extra rope helps only if it can do the job.

Also, consider the home set. In the GreatGrady discussion, one owner mentioned that he had six lines at the dock and five aboard his boat. He meant two sets. Having five lines aboard was not a standard.

If your home lines stay at the dock, do not include them in the number of lines to choose for the coming stop. Start from the ropes you would need at the planned destinations and add some spare ones. This is the carried set of lines that you need to purchase.

This long rope may already perform two functions

You can lead a single continuous rope to the dock cleat, secure it there, and continue leading to another attachment point. You have two useful segments of the rope, but one rope in your inventory.

It makes a difference when you want to describe the unused segment as a spare. If the rope is already used in some other place, this unused segment is not an independent spare line lying in the locker.

Departure should also be considered. Can you adjust or release one segment without interfering with the other one? It depends on the way you secure the rope between them. Separate ropes are easier to handle, but two sharing one cleat still depend on the same fitting.

When drawing the sketch of the berth layout, show two segments as they actually lead. When making the list of the equipment, count each physical rope only once.

Find the home for your spring before adding it

No midship cleat on the boat? Check the dock also. Two possible arrangements are: from the boat's bow and stern attachments toward the appropriate cleat at the middle of the dock finger, and using a midship cleat on the boat and dock attachments forward and aft. You can see these examples at RBYC's diagrams.

However, you should still consider the proper fitting. A handy rail or a little hook is not appropriate for leading just because you can lead a rope around it. If the lead would rub the boat's hull, block boarding, or have no suitable place to attach it, work through this with the marina or a qualified rigger first. Then you can purchase a rope for the lead.

Your shopping list has a place to start

I would put the destination name next to each working line: this attachment on the boat to that dock cleat. Also, mark what lines are stowed at home and what come aboard. Every spare line on your list should have its function.

Now you can see whether two additional lines fill the gap. Diameter and fittings for these jobs should be checked; the cleat-hitch guide gives you the way of connecting. There is no need to analyze these subjects again just to decide on the number.

A few points before your purchase

Would two lines be enough for a brief stop?

Do not form an overnight equipment list based on the lines you used at the quick, supervised fuel stop. Conditions and supervision are different. Agree on the actual tie-up layout with the skipper and dock staff.

Should I have the lines ready on both sides?

Having them on both sides may save a last minute maneuver in case the side changes. Consider them as prepared lines, but not necessarily working together. Make sure the unused lines stay out of the water and out of the way of the working lines.

What about the lines supplied with the mooring whips?

Count the whip control lines separately. Whips can help keep the boat from the dock, but Taylor Made's installation recommendations still require bow, stern and spring lines. Follow the instructions for your equipment and include those dock lines in your list.

Cover illustration: AI-generated. Dock-line diagram: PROPELTECH.

Recently viewed

Saved on this device. Select a product to return to it.

Your shopping bag

Loading your bag…